Lehi UT homeowner comparing Tesla Powerwall and EG4 battery with Ask Solar Mike, securing safe setup before 2026 ITC risks and company failures.

Lehi Batteries 2025: Tesla vs EG4 Risks

November 17, 20253 min read
Ask Solar Mike

Ask Solar Mike

Compare Safe Choices Before ITC Ends—Avoid 2026 Hikes and Failures in Utah County

Introduction

Utah's solar scene grows fast. But challenges loom. Over 100 solar firms went bankrupt in 2024-2025 due to high rates and policy shifts. Rocky Mountain Power hiked bills 4.7% in 2025. Lehi homes face more blackouts. Which battery—Tesla or EG4—fits best before ITC changes?

Pain Points Analysis

Utah's solar market hurts now. Fresh data shows big drops. Residential solar installs fell sharply in Q1 2025 to 1,106 MWdc nationwide. Utah follows this trend with a 30% market contraction from 2024. Rocky Mountain Power's 4.7% rate hike adds $4.31 monthly to average bills. The ITC expires December 31, 2025, with no extensions. Supply chain issues and financing woes add pressure. Battery waits stretch 2-6 months due to high demand. Here are seven key pains, simple for Lehi families.

  • ITC Expiration Rush: The 30% tax credit ends December 31, 2025. No more savings. Lehi folks worry about missing it and losing thousands. Market rush causes delays up to six months.

  • Rate Hikes Squeeze Budgets: Rocky Mountain Power's 4.7% increase hits in 2025. Bills rise $4.31 a month on average. Utah's energy demand grows, making costs worse.

  • Solar Company Bankruptcies: Over 100 failures in 2024-2025, like Sunnova in June 2025. High interest rates and policy shifts cause this. Many rely on incentives. Post-2025, more could close, stranding Lehi projects.

  • Price Spikes Without ITC: No credit means costs jump 50-100%. Competitors hike quotes amid supply issues. Lehi homes could pay double for batteries.

  • Battery Wait Times: High demand from trends pushes waits to months. Prices spike without credits, leaving families vulnerable to blackouts.

  • Warranty Failures: Bankrupt installers leave warranties worthless. Real cases in 2025 show customers with broken systems and no support.

  • Unfinished Installs: Deadline stress leads to rushed jobs. Miss 2025? No credit, higher bills. Lehi risks incomplete setups if firms fail.

Most Utah solar companies depend on ITC margins. They will hike prices 50-100% or shut down post-2025, stranding customers.

Solution Section

Skip these pains with Ask Solar Mike. As a Tesla Preferred Installer in Lehi, we compare Tesla Powerwall 3 and EG4 ESS to fit your needs. Our Instant Tax Rebate Program solves them all.

We deduct 30% upfront—no wait, no risk if install delays past 2025. We take the hit.

Tesla Powerwall 3 offers seamless ties and high output (11.5kW, 13.5kWh). EG4 ESS shines for scalability and lower cost. Value: Powerwall at $12,000 installed vs. $24k-$26k elsewhere. Rocky Mountain Power rebate? $10,000 total. EG4 starts cheaper. No jumps post-2025—our structure stays stable.

Urgency: ITC ends 12/31/2025. Proof: Tesla partnership ensures reliability.

Vet firms: Do they survive without ITC? Only Ask Solar Mike is immune.

Book a free consult at asksolarmike.com/google or call 385-312-0904 to secure your spot risk-free. Email [email protected].

Interactive Infographic

Compare Tesla vs EG4! Enter your needs for personalized costs and savings.

Custom HTML/CSS/JAVASCRIPT

Conclusion

Choose your battery wisely—Ask Solar Mike makes it risk-free for Lehi.

"Tesla Powerwall powered through outages—amazing deal!" – Lehi customer.

"EG4 fit our needs perfectly, saved tons!" – Utah County family.

Check zero down secrets or blackout-proof tips. Ready? Visit asksolarmike.com/google, email [email protected], or call 385-312-0904 now.

Learn More:
📧[email protected]
📞 385–312–0904
www.asksolarmike.com

Back to Blog